Infrastructure

Plans & Projects

Cogswell Hall HVAC Project

46 window mounted air conditioner units

Estimated Cost:  $276,000

Prospect HVAC Project

  • Replace existing VRF units with individual PTAC units
    Estimated cost:  $452,000

  • Remove hazardous old equipment
    Estimated cost:  $17,000

  • Purchase and installation of 60-ton AAON Roof Top Unit with 29 Variable Air Volume boxes to regulate air flow
    Estimated cost:  $534,000

  • Purchase and installation of 2 KN boilers that work in conjunction with the AAON system to provide heat
    Estimated cost:  $62,000

  • Purchase and installation of 2 AAON energy recovery ventilation units that bring outside air into the building

  • Install Wattmaster Building Automation System Controls
    Estimated cost:  $84,500

  • Purchase and install 2 Lochinvar hot water boilers
    Estimated cost:  $46,000

  • Purchase and Install one mini-split unit for IT room
    Estimated cost: $4,500

Total Estimated Cost:  $1,200,000

Exterior Restoration at Prospect

  • Restoration of the building exterior: window frame replacement, strip/replace wood and paint/stain, replace missing and loose masonry, remove window decals, clean all window and wash all masonry repairs to remove dust and construction staining.
    Estimated Cost:  $700,000

  • Remove and replace parking lot
    Estimated Cost:  $151,700

Capitol Improvement Project

Phase One (FUNDING SECURED AND PROJECT COMPLETED):

  • Replacement of the building roof

    Estimated cost: $300,000.00

 Phase Two (FUNDING SECURED AND PROJECT COMPLETED):

  • Expansion of camera system into Early Learning Center

  • Implementation of safety training for resident and returning staff (working from home phase-out)

  • Expansion and upgrade to door lock intercom system

    Estimated Cost:  $70,000.00

Phase Three (FUNDING SECURED AND PROJECT PENDING COMPLETION):

  • Build out of security system

  • Door stops in Early Learning Center and Administrative Staff

  • Metal detectors at points of entry

  • Panic Buttons for YWCA Greater Cleveland staff

    Estimated cost: $125,000.00

Phase Four (FUNDING REQUEST PENDING)

  • Replacing Heating Ventilation and Air Conditioning (HVAC) system

Estimated Cost: $700,000

Phase Five

  • Building exterior restoration

  • Replacement of the parking lot

Estimated Cost:  $851,700